The preparation work before the operation of Huaquan generator is an important link to ensure the smooth start-up and safe operation of the generator. The following are the preparation steps based on the usage suggestions and relevant technical information of Huaquan generators:
huaquan generator
1. Huaquan generator inspection:
Ensure that the generator and its ancillary equipment are clean and in good condition, without any abnormal conditions such as oil leakage or loose wiring connections.
Check if all fasteners, gearbox, clutch, governor and other mechanical components are in good condition.
Check the oil level to ensure that the engine oil, fuel, coolant, etc. are sufficient and meet the usage requirements.
 
2. Huaquan Generator Lubrication System Inspection:
Check if the engine oil is sufficient and if the oil quality is qualified.
The oil page should be located in the middle of the oil dipstick scale line, and the oil cap is already closed.
 
3. Inspection of Huaquan Generator Cooling System:
Ensure that the cooling water pressure and temperature are normal.
Check if the hydrogen charging of the generator is normal (if applicable).
 
4. Huaquan generator electrical system inspection:
Use a megohmmeter to check whether the insulation resistance of the generator and its ancillary equipment meets the requirements. Generally, it should be above 200M Ω (in humid areas, it should not be lower than 2M Ω at room temperature).
Ensure that all electrical equipment is well grounded and free from electrical leakage.
Check if the battery voltage is sufficient, if the battery connection is secure, and if there are no short circuits.
huaquan generator
5. Huaquan generator starting system inspection:
Ensure that the startup system is functioning properly, including the starter motor, starter switch, etc.
 
6. Huaquan generator exhaust system inspection:
Ensure that the exhaust pipe is unobstructed and there are no leaks.
 
7. Inspection of Huaquan Generator Fire Protection and Protection System:
Check if the fire extinguishing device is in good condition.
Ensure that all protective devices are intact and in operation.
Check if the temperature measurement points of the stator and rotor match the actual values.
 
8. Other preparatory work for Huaquan generator:
Compare the random drawings of the unit and check if the generator leads match the wiring diagram.
Check if the signal lights of the generator set are indicating normally.
Check if the switch of the generator set is in the correct position.
Before starting, preheat the fuel and turn on the liquid stabilizer (if applicable) to ensure smooth fuel flow.
Start the air vent, find the vent bolt, vent until the liquid is only diesel and the bubbles disappear, then tighten the vent bolt.
huaquan generator
9. Huaquan Generator Safety and Environmental Inspection:
Ensure that the generator is installed in a well ventilated and well ventilated area.
If installed in a sealed place, ensure that there is sufficient cooling equipment installed.
Check if the cables are connected correctly and confirm if the main switch and lights are functioning properly.
Check the switches and control circuits to ensure they are functioning properly, including emergency stop buttons and lights.
Ensure that all personnel safely exit and stay away from the generator operating area.
 
After completing the above preparation work, you can start the generator according to the instructions in the user manual. During and after the start-up process, close attention should be paid to the operating status of the Huaquan generator. If there are any abnormalities, the machine should be stopped immediately for inspection. At the same time, relevant safety operating procedures should be followed to ensure the safety of personnel and equipment.
More information on Huaquan generator:http://www.fadianjidl.com/

Sales hotline: +86 15905360672
WeChat customer service: +86 15905360672
Email address: huaquan@huaquanpower.com
Official website: https://www.huaquanpower.com
Production Base: No. 11666 Guting Street, Economic Development Zone, Weifang City, Shandong Province
Company Name:SHANDONG HUAQUAN POWER CO.,LTD